Client / Main Contractor: Ecovyst (formerly Technip Energies)
Barrow Electrical were appointed to deliver the full electrical package for the design and build refurbishment of a three-storey commercial office building at Hesketh House, Warrington.
Working within a live refurbishment environment, we delivered a coordinated installation for open-plan workspaces, boardrooms and staff welfare areas, with a focus on flexibility, efficiency and long-term maintainability.
Scope of Works Included:
Complete installation of power, lighting and structured data systems
Bespoke solutions to suit varied office layouts and functional requirements
Three-compartment trunking and associated containment systems
Energy-efficient lighting incorporating switched and PIR-controlled systems
Close collaboration with other trades ensured the seamless integration of services and maintained programme certainty throughout the refurbishment.
Project Outcomes:
Delivered on programme with no disruption to the overall build schedule
Fully compliant installation aligned with current regulations and best practice
High-quality finish supporting a modern, flexible working environment
Handover Documentation:
NICEIC Electrical Installation Certificate
Comprehensive as-built drawings
Emergency lighting layouts to support ongoing compliance and maintenance
The project was completed to the client’s satisfaction, reinforcing Barrow Electrical’s capability in delivering commercial refurbishment projects with precision and reliability.
